
79D0007 1/11 Rev. 5Installation and Operating Instructions790007Designer l
1079D0007Lo-Rider Vent Free FireboxesFigure 13 - Top View of Framing Specications for See-Through Unit (Model 36ST
1179D0007Lo-Rider Vent Free Fireboxes1. Attach nailing anges in desired position. Figure
179D0007Lo-Rider Vent Free Fireboxes1. Attach nailing anges in desired p
1379D0007Lo-Rider Vent Free FireboxesA canopy is furnished with each rebox and be installed for s
1479D0007Lo-Rider Vent Free FireboxesConsult all local codes. All gas piping must be installed to comply with local codes, or in the absence of local
1579D0007Lo-Rider Vent Free FireboxesIf you are installing the forced air kit Model BLOTDL on the LSTF36, LPF36,
1679D0007Lo-Rider Vent Free Fireboxes1. Locate combustion air assembly at an exterior location which is
1779D0007Lo-Rider Vent Free FireboxesThe use of outside air for combustion is optional unless required by building codes
1879D0007Lo-Rider Vent Free Fireboxes1. Push insulation back approximately " from the end of each duct.. Slip
1979D0007Lo-Rider Vent Free Fireboxes• Allow glass to cool before c
79D0007Lo-Rider Vent Free Fireboxes
079D0007Lo-Rider Vent Free Fireboxes16345310728790007VF designer parts 1. 36&
179D0007Lo-Rider Vent Free Fireboxes
79D0007Lo-Rider Vent Free Fireboxes
379D0007Lo-Rider Vent Free FireboxesThe following components are warranted for life to the original
149 Cleveland Drive • Paris, Kentucky 40361www.mhsc.com
379D0007Lo-Rider Vent Free Fireboxes1. Due to high temperatures, the rebox should be located out of trafc and
479D0007Lo-Rider Vent Free Fireboxes
579D0007Lo-Rider Vent Free FireboxesFigure 1 - Firebox DimensionsTop426QE”396QE”236M”226QE”11(6”11(6”56”126”116”36QE”1
679D0007Lo-Rider Vent Free FireboxesCarefully select the best location for installation of your vent-free rebox. The following facto
779D0007Lo-Rider Vent Free FireboxesEnsure that minimum clearances shown in Figures 3 through 7 are maintain
879D0007Lo-Rider Vent Free Fireboxes5. —
979D0007Lo-Rider Vent Free FireboxesFirebox framing can be built before or after the appli-ance is set in place. Construct rebox fram
Komentáře k této Příručce